Hollow piles in steel used to harness geothermal energy |
|
|
|
|
|
|
|
- |
Administrative building: |
|
comprising of 3 towers with 7 floors and 3 sublevels |
|
|
|
|
|
|
- |
Total volume: |
|
150,300 m3 |
|
|
|
|
|
|
- |
Floor space: |
|
38,880 m2 |
|
|
|
|
|
|
- |
Completion: |
|
2004 |
|
|
|
|
|
|
- |
Client: |
|
Bolzano Municipal Council
Institute of Public Housing Construction of the Province of South Tyrol
Bolzano Chamber of Commerce |
|
|
|
|
|
|
- |
Architect: |
|
Dr. Arch. Wolfgang Simmerle, Bozen |
|
|
|
|
|
|
- |
Building services consultant: |
|
Felderer-Klammsteiner Consulting Engineers, Bolzano |
|
|
|
|
|
|
|
|
|
 |
Total capacity of the enercret installation: |
|
|
|
|
- |
Heating capacity: |
|
370 kW |
|
|
|
|
|
|
- |
Cooling capacity: |
|
80 kW |
|
|
|
|
|
|
- |
Annual heating output: |
|
450 MWh |
|
|
|
|
|
|
- |
Annual cooling output: |
|
134 MWh |
|
|
|
|
|
|
|
|
|
 |
Hollow piles in steel: |
|
|
|
|
|
340 micro-piles in steel tube, length 15.30 m, DN 193.7 mm, were installed as shoring for the construction pit. Each of these piles is fitted with 2 loops (4 pipes) of HDPE piping 20/2.0 mm.
Total length of piping: 20,000 m
The 111 circuits incorporated in the pile system are connected to 5 submanifolds which are in turn connected to the main manifold in the building services centre via flow and return lines. |
|
|
|
|
|
|
 |
Ground slab system: |
|
|
|
|
|
6000m² of ground slab are fitted with 23,500 m of HDPE piping 25/2.3 mm spaced at 30 cm intervals. The 110 absorber units in the ground slab are connected to 6 submanifolds, which are in turn connected to the main manifold in the building services centre via flow and return lines. |
|
|
|
|
|
|
 |