DEKA Immobilien, Frankfurt - D
ABG Allgemeine Bauträger- und Gewerbeimmobiliengesellschaft mbH & Co, Köln - D
-
Architect:
J.S.K. Architekten, Frankfurt - D
-
Building services consultant:
P. Berchtold Ingenieurbüro für Energie- und Haustechnik, Sarnen - CH
enercret installation:
The foundation piles of up to 35 m in length with a diameter of 90 cm to 150 cm were fitted with the Nägele energy system enercret, which involved installing approx. 30 km of HDPE piping DN 25/2.3mm.
The energy extracted from the ground covers part of the heating and cooling requirements of the high-rise building and cuts annual CO2 emissions by 90 tonnes.